GENERAL PROCEDURES (FRONT AND REAR AXLES)


id031000800100


Wheel and Tire Installation

1.  When installing the wheels and tires, tighten the wheel nuts to the following tightening torque in the order shown in the figure.

ac5wzw00000986

Tightening torque
108—147 N·m {12—14 kgf·m, 80—108 ft·lbf}

Suspension Links Removal/Installation

1.  For the joint sections with rubber bushings, raise the vehicle using a lift, and then temporarily tighten the installation bolts and nuts. Lower the vehicle to the ground and tighten them to the specified tightening torque.


Connector Disconnection

1.  Disconnect the negative battery cable before performing any work that requires handling of connectors. (See NEGATIVE BATTERY CABLE DISCONNECTION/CONNECTION [SKYACTIV-G 1.5, SKYACTIV-G 2.0, SKYACTIV-G 2.5].) (See NEGATIVE BATTERY CABLE DISCONNECTION/CONNECTION [MZR 1.6].) (See NEGATIVE BATTERY CABLE DISCONNECTION/CONNECTION [SKYACTIV-D 1.5].) (See NEGATIVE BATTERY CABLE DISCONNECTION/CONNECTION [SKYACTIV-D 2.2].)